
Repower Vermont Retire Vermont Yankee
View full report [pdf] »“A green, renewable energy economy isn’t some pie-in-the-sky, far-off future. IT IS NOW.” – President Barack Obama
• We can replace over 100% of the power VY makes nowwith local clean energy!
• 98% of Vermonters support increasing the amount of electricity we get fromrenewable energy
• Building our clean energy future will generate over 3,000 good paying jobs in Vermont
• Repowering Vermont with clean energy would cut our global warming pollution in half and eliminate the
production of radioactive waste.
Retire Vermont Yankee. Don’t repeat past mistakes
• It was only built to run 40 years, ending 2012
• The plant’s design is so outdated, it would not be allowed to be built today
• Pushing the old plant beyond its limits, VY is running at 120% of its designed capacity
• 76 cracks have already been identified in large reactor components since 2005
• In Aug. 2007, a cooling tower collapsed after “deferred maintenance”
• Two independent inspections concluded that VY has serious reliability problems
• In the first three months of 2009, VY suffered from THREE separate radioactive leaks






