• We can replace over 100% of the power VY makes nowwith local clean energy!

• 98% of Vermonters support increasing the amount of electricity we get fromrenewable energy

• Building our clean energy future will generate over 3,000 good paying jobs in Vermont

• Repowering Vermont with clean energy would cut our global warming pollution in half and eliminate the
production of radioactive waste.

Retire Vermont Yankee. Don’t repeat past mistakes
• It was only built to run 40 years, ending 2012

• The plant’s design is so outdated, it would not be allowed to be built today

• Pushing the old plant beyond its limits, VY is running at 120% of its designed capacity

• 76 cracks have already been identified in large reactor components since 2005

• In Aug. 2007, a cooling tower collapsed after “deferred maintenance”

• Two independent inspections concluded that VY has serious reliability problems

• In the first three months of 2009, VY suffered from THREE separate radioactive leaks